Follow us :

Jialing smoothly through the 3C supervision and inspection

time2017/04/14

December 7-8, China Quality Certification Center experts and his entourage 4, in accordance with the "mandatory certification of the implementation of the rules of motorcycles", "mandatory certification implementation of the rules of the engine," the relevant provisions of the implementation of supervision and inspection of my Jialing, Jialing passed This check. Jialing Lu Zhe, deputy general manager and the relevant units in charge of quality leadership attended the first, the last meeting.

      The inspection mainly involves the Jialing headquarters two rounds of motorcycles, three rounds of motorcycles, engines, inspection mainly related to product consistency control related to start.

      In the two-day inspection, the expert group closely around the "production consistency control plan" and Jialing reported "consistent control plan implementation annual report", Jialing product physical consistency control plan to carry out inspection, including vehicle , The whole machine to confirm the test test, parts procurement control and inspection, test, on-site production process control capabilities, on-site vehicle, machine assembly and parts of the consistency check, vehicle, machine sampling test Rigorous review, involving a total of 2 into a car and a consistent inspection of the engine.

      At the last meeting, the expert group fully affirmed Jialing solid quality management work, while the inspection found in the problem points were notified, out of a non-compliance. Jialing Deputy General Manager Lu Zhe expressed his heartfelt thanks to the hard work of the expert group; asked all units to strengthen the understanding and implementation of the new rules of 3C, the production of consistency control to do fine do, but also requires the responsible unit within the specified time Complete the non-conformance rectification.